Before starting production with a cone crusher, it is important to perform several inspections to ensure that the machine is in good condition and ready to operate. Here are some necessary inspections that should be done before starting production with a cone crusher:


1. Check the oil level: Check the oil level in the lubrication system and make sure that it is at the correct level. This will ensure that the machine is properly lubricated and can operate smoothly.


2. Check the belt tension: Check the tension of the belts that drive the crusher. Loose or worn belts can cause the machine to malfunction or break down.


3. Check the crusher settings: Check the crusher settings, including the gap between the mantle and concave, and make sure that they are set correctly for the desired product size.


4. Check the electrical connections: Check all electrical connections and make sure that they are secure and properly grounded.


5. Check the safety devices: Check all safety devices, including the emergency stop button, and make sure that they are functioning properly.


6. Check the wear parts: Check the wear parts, such as the mantle and concave, and make sure that they are in good condition and do not need to be replaced.


Here is a table summarizing the necessary inspections that should be done before starting production with a cone crusher:


| Inspection | Description |

|------------|-------------|

| Check the oil level | Check the oil level in the lubrication system and make sure that it is at the correct level. |

| Check the belt tension | Check the tension of the belts that drive the crusher. |

| Check the crusher settings | Check the crusher settings, including the gap between the mantle and concave. |

| Check the electrical connections | Check all electrical connections and make sure that they are secure and properly grounded. |

| Check the safety devices | Check all safety devices, including the emergency stop button. |

| Check the wear parts | Check the wear parts, such as the mantle and concave. |


Please note that these inspections are only for reference and may vary depending on the specific situation. It is recommended to consult with a qualified engineer or manufacturer for a proper analysis of the necessary inspections needed before starting production with a cone crusher.

Contact

You can get the price list and a WinnerMac representative will contact you within one business day.